Solar power in the Eastern Cape
The Eastern Cape's two metros both want to approve your solar system before it runs, but they size, meter and credit it in quite different ways.
Get solar power quotes in the Eastern Cape
It takes about a minute.
- Free, no obligation
- Up to 3 quotes
We handle your information under POPIA. Read our privacy policy.
- Free to request, no obligation to accept
- Up to 3 quotes to compare
- 200+ registered service providers
- 80,000+ quotes supplied by our providers
- 200+ registered service providers
- All 9 provinces served
Nelson Mandela Bay (Gqeberha, Kariega, Despatch) and Buffalo City (East London, Qonce, Bhisho) sell electricity to their own customers and set their own embedded generation rules. Both had an approved SSEG tariff in SALGA's 2023 survey, and registered capacity had grown from 10 to 26.8 MWp in Nelson Mandela Bay since 2020, and from 0.2 to 8.8 MWp in Buffalo City.
NERSA confirmed in February 2026 that a grid connection, not exporting, is what triggers registration: a system of 100 kW or less wired to a municipal or Eskom supply must be registered with that distributor.
Nelson Mandela Bay: your supply size caps the system
The metro's SSEG requirements limit generation on a shared low-voltage feeder to roughly 25% of your notified maximum demand. On a standard single-phase 80 A house supply that works out to 4.6 kW, and anything larger must be a balanced three-phase system, which means upgrading to a three-phase supply first.
After you apply, Metering Services inspect the site with your electrician and quote; you pay, then submit the certificate of compliance, commissioning confirmation and a declaration from an ECSA-registered engineer or technologist. The metro then fits its own bi-directional meter, charging you half the meter's cost plus fitting and admin.
The metro only takes applications from customers who buy electricity directly from it, not through a reseller such as a complex. Domestic solar customers are billed on the Domestic Time-of-Use tariff, with exports set off against imports in the same time slot.
How Nelson Mandela Bay credits exports
Under the 2016 rules, surplus left at the end of a billing cycle was forfeited. The metro's 2025/26 net-billing application to NERSA proposed something better:
- Exports are credited at 80% of the metro's avoided Eskom cost, per time-of-use period, and only up to what you import in that period.
- Credits offset energy charges only, not fixed or basic charges.
- Unused credit rolls over within the municipal financial year; there's no cash payout.
- If you sell the house, the buyer signs a new agreement and your credits don't transfer.
Buffalo City: meter changes and real penalties
Buffalo City's application form brings costs other metros don't: your prepaid meter comes out, and you pay a security deposit and open a credit account. If your house is fed by overhead mains, they must be replaced with an underground service and a low-voltage meter cubicle at your expense. Panels may not stand more than 1.5 m above the roof line, and ground-mounted arrays over 2.1 m need approved building plans.
The old form said exports earned nothing until the metro adopted a feed-in tariff. It has since done so: the 2025/26 tariff book credits approved installations R1.61 per exported kWh including VAT, capped at the energy you import that month. The same tariff book lists a charge of R3,853.45 for failing to register an SSEG system after a written instruction.
Smaller towns and Eskom areas
Outside the metros, readiness varies. SALGA's 2023 survey found Kouga (Jeffreys Bay, Humansdorp) with an approved SSEG tariff and 4 MWp registered, while Makana (Makhanda) had an application process but no approved tariff. Where Eskom bills you directly, your installer registers the system with Eskom, which has waived its registration-related fees for grid-tied systems up to 50 kVA until further notice.
Solar Power prices in the Eastern Cape
Published 2026 price guides don't show a reliable difference in installed solar prices between the Eastern Cape and the rest of the country, so use the national ranges in the solar cost guide.
The connection costs are local: a share of the meter and possibly a three-phase upgrade in Nelson Mandela Bay; a deposit, meter and perhaps an underground service in Buffalo City. Ask installers to list these separately, and see what to check before you hire.
Where in the Eastern Cape
You can request quotes from anywhere in the province, including Nelson Mandela Bay, Buffalo City, Gqeberha, Kariega, East London, Mthatha, Makhanda, Komani, Jeffreys Bay, Port Alfred. Choose your region and suburb in the form, and providers who cover your area will quote.
Solar Power in the Eastern Cape: questions
How big a solar system can I connect in Gqeberha?
On a standard single-phase supply, Nelson Mandela Bay caps embedded generation at 4.6 kW, roughly a quarter of the supply's notified maximum demand. A three-phase 80 A supply allows about 13.9 kVA. Ask the metro to confirm your supply size before you sign a quote.
Does Buffalo City pay for solar power I feed back?
Yes, once approved. The 2025/26 tariff book credits R1.61 per exported kWh including VAT, but net billing means the credit can't exceed what you import in the same month. Rates change each July, so ask for the current figure.
Can I keep my prepaid meter with solar in East London?
Not under Buffalo City's application form. It requires the prepaid meter to be removed by your electrician and handed to the metro, a security deposit, and a credit account. Ignoring the process is costly: the 2025/26 tariff book lists R3,853.45 for failing to register after a written instruction.
Sources
- NMBM Requirements for Small Scale Embedded Generation (SSEG), Nelson Mandela Bay Municipality, effective 1 July 2016
- NERSA Submission: Embedded Generation Tariff Application 2025/26, Nelson Mandela Bay Municipality, 2025
- Application for the installation of Small Embedded Generating Equipment connected to the BCMM Electricity Grid, Buffalo City Metropolitan Municipality
- Tariff Book 2025/2026, Buffalo City Metropolitan Municipality
- Status of Embedded Generation in South African Municipalities, SALGA, December 2023
- NERSA clarifies Small-Scale Embedded Generation regulations, SAnews, 3 February 2026
- Good news for solar users: Eskom drops registration fees until further notice, News24, 1 October 2026
Last updated 28 October 2026.
How it works
Tell us about the job
A few questions about what you need and where you are. There's no account to create.
Get up to 3 quotes
Solar installers that work in your area contact you with a price.
Compare and choose
Weigh up price, timing and what's included. Accept the one that suits you, or none.
Before you request quotes
The questions people ask us most.
Is it really free?
Yes. Requesting quotes costs you nothing. The providers pay to receive requests, which is how the service is funded.
Will I be flooded with calls?
No. Your details go only to the providers quoting on your job, up to 3 of them.
Do I have to accept a quote?
No. Compare the quotes, ask questions, and accept one if it suits you. If none do, you don't have to go ahead.
Are the providers any good?
More than 200 registered service providers quote through our network. Compare quotes carefully, ask for references and photos of past work, and use the checklist on each service page before you hire.
How quickly will I hear back?
The solar installers who quote on your job contact you directly by phone or email.
What if I'm not happy with any of the quotes?
You don't have to accept any of them. If the prices are all higher than you expected, ask each provider what's driving the cost. The answers often show what the job really needs.
Is my information safe?
We handle your personal information in line with the Protection of Personal Information Act (POPIA) and share it only with the providers quoting on your job, up to 3 of them. Our privacy policy explains what we collect and your rights.
Get solar power quotes in the Eastern Cape
Up to 3 quotes, free to request and no obligation.